News Details
October 12 2010

January 2008 - SSS, Pumps

 

We just completed (week 01-2008) two pumping units.
These units are rugged, built with well proven components: Lister 6 cylinders air cooled engines, Sykes centrifugal pumps.
12 additional units (more compact) will be built by the end of February. These units will be based on same principle; air cooled engines (Deutz) and rugged centrifugal pumps.

 

 

Semaine 01-2008, nous venons d'ajouter 2 unités pompe additionnelles à notre stock.
Ces unités sont adaptées aux conditions tropicales : Moteur Lister Air cool 6 cylindres, pompe centrifuge Sykes…
12 pompes seront fabriquées sur les même principes de base (moteur refroidi air et pompe centrifuges) avant la fin Février 2008.

 

 

 

Download .pdf file

Home
Latest News
March 10 2020
Loading fushing spread for one of our valued clients
March 11 2015
New arrival of industrial valves, heavy duty suction hoses and FLEXCo mobile
November 03 2014
OIS Gabon and OIS Congo offer material rental and maintenance services
November 03 2014
Short and long cargo baskets, horizontal chemical stands and miscellaneous skips
October 12 2014
Inspection, non destructive testing and certification of all oil related industrial equipment.
October 04 2014
Bottles Rack and 20 ft open top containers
March 29 2014
Fabrication et test de flexibles hydrauliques
March 05 2014
LiftCo Représentant au Gabon et Congo
Login

header ois alone